Tile A Bathroom Floor Wood Subfloor
If the old subfloor is covered with a thick bed of mortar that s in good condition you can tile over it.
Tile a bathroom floor wood subfloor. If water seeps through the tile installation to the underlayment it will not cause the wood to swell as happens with interior grade plywood. If the mortar bed is uneven or cracked apply a leveling or patching compound as needed first. A 3 4 inch plywood subfloor on a joist structure with 24 inch spacing needs the extra thickness of cementboard or the floor will flex and the tiles will crack. There are various types of tile underlayment but all serve to smooth out uneven.
Know the joist spacing of your home before installing ditra. With a trowel scoop out and spread enough mortar on. Tile floors there s no doubt they make homes look nicer. Add a layer of 1 2 in.
But what s not so awesome are broken. Bc plywood over the old subfloor using construction adhesive and driving 1 1 4 in. Use a polymer modified thin set a type of mortar to attach the backer board to the subfloor. Use a large bucket and.
Screws every 6 in. The bathroom remodel involves installing a new tile floor with 12x24 porcelain tile. Hope you didn t like your beautiful new tile floor. But with the size of the gaps in the top layer of subfloor i suspect that using schluter ditra as the underlayment isn t as straightforward as we had hoped.
To install bathroom tile over plywood you ll have to follow a series of steps. Install ditra on a wood subfloor stop cracked tiles step 1. The subfloor the underlayment and the surface tile you walk on. The plywood adds stiffness and stability to the floor.
But again this tutorial is. Here s what i would like to know. Try laying tile over 1 2 durock or hardie and see what happens when the joists are 19 2 or 24 on center. With the plywood in place install the backer board as you normally would.
Uncoupling membranes aren t recommended for tiles smaller than 2 inches square and should not be used when covering old hardwood flooring due to adhesion problems. If the subfloor is plywood install a layer of cement backer board on top before tiling. A tile floor consists of three individual layers. Get the dimensions of the room and then multiply them to get the square.
Exterior plywood is an acceptable underlayment for tile and is preferred to interior grade plywoods because the bonding adhesives used are waterproof. We had planned to install thinset schluter ditra thinset tile. Tile can be installed over a plywood substrate and it is actually a fantastic way to make sure you don t have deflection in your floor.