Timber Floor Cavity Wall
I contacted quite a few tf companies and it seems that those who are happy to build a house don t want to build extensions only supply and erect the frame at best.
Timber floor cavity wall. Timber wall plate laid on top of sleeper wall to allow joists to be fixed. I have the outer block one course higher than the inner and a 100mm cavity i was hoping to have the floor joist crossing the cavity by 90mm so that i could use 195mm timber plate sat on top of the outer block and the joists so that i can build 195mm timber frame and not loose the space in the rooms the first floor is to be. Ventilation of the cavities in timber framed walls c h sanders centre for research on indoor climate and health school of engineering science and design glasgow caledonian university december 2005 summary this report reviews the available guidance on the need to ventilate the cavity between the cladding and the sheathing of timber framed walls. Standards for damp proof courses are provided in bs 8215 1991 code of practice for design and installation of damp proof courses in masonry construction.
Unfortunately with the passing of time and the possible closure of some air bricks often this wall plate will deteriorates. External wall junction with timber floor masonry outer leaf minimum 100mm thick external wall cavity minimum 50mm rockwool tcb in cavity satisfies acoustic regulations and acts as a 30 minute fire stop or 60 minute if cavity greater than 89mm resilient strip where chipboard and resilient plasterboard meet wall. Base of wall built off beam slab etc. As you can see from the image above a timber wall plate is laid on top of the sleeper wall to allow a fixing from the joist to the wall to be fitted.
Detail to prevent entry of damp by driving rain. In cavity walls over openings air bricks etc. Accredited construction details quinn building products junction designs to combat thermal bridging thermal bridging is a much talked about but little understood phenomenon in building design. Thermal bridges occur at all junctions in the building as well as when penetrations of the thermal insulation envelope occur.
Beneath coping and 150mm above adjoining roof surface to link with the roof upstand. In suspended timber ground floors between the timber and materials that can carry moisture from the ground. Bungalow has standard cavity wall construction the first floor i hope will be a timber frame. Thermal bridges can account for 35 50 of overall fabric.
A cavity tray should be provided to direct any water that enters the cavity to the outside. If it is in an external cavity wall. This prevents the risk of condensation forming in the cavity which can happen when alternative wall insulation methods are used.