Timber Floor Installation Checklist
Acclimation if you are purchasing a solid wood floor we must make arrangements to deliver your wood at least 48 hours prior to your installation.
Timber floor installation checklist. Site inspection checklist sub floor ventilation install guidelines restraining methods. The temperature should be between 64 and 86 degrees fahrenheit with a humidity level between 25 and 70. At the time of installation the recommended moisture content is 10 or less for wood floors and 12 or less for subfloors. 09 timber flooring design guide page 6 1 timber flooring and floor finishes 1 1 movement in timber floors prior to discussing timber flooring products it is important to understand the relationship between timber humidity in the air surrounding it and the dimensional changes that occur as the result of changes in humidity.
Make sure your subfloor is flat and level. Since laminate flooring is a wood product damage can occur if the flooring absorbs humidity or dries. Also when the installation is complete be sure to thoroughly inspect your new floors for any nicks or minor gaps and fill these with wood putty that is the appropriate color. This checklist is not intended to replace the advice of sound legal counsel or remove your responsibilities for being familiar with the national wood flooring association installation guidelines.
Check your subfloor for moisture. Don t install the product unless it s in this. Before installation checklist when you make the choice of laying a new hardwood floor you need a tradesman or professional floor layer to examine your sub floor and determine what the new floor should be layed over. All flooring needs to be delivered to the job site and allowed to acclimate before installation can begin.
Acclimate flooring inside installation space at least 48 hours prior to installation 72 hours for solid hardwood remove any carpet and padding. A constant temperature between acclimatization and installation is very important. Timber treatment a must for any architect designer engineer or builder who specifies or uses timber in designing a project. This checklist is provided to you freely as an aid to help you cover your rear and give you the best chances possible at helping you to follow the.
Checklist coating products summary coating products. On the day the installation team arrives to install your new floor. The wood must be brought into the home and placed in the area s where it will be installed. Ceramic tile homeowners who choose ceramic floor tiles do so most likely because tiles put the tile in versa tile.
This difference between flooring and subfloor shouldn t exceed 2. When the installation site is initially measured and inspected. Concrete slab the moisture content needs to be below 5 5 or the in slab rh below 85 and. Moldings trim moldings and trim are made to coordinate with your wood not match it.