Toilet Supply Line Rough In Floor
Or suppose you re roughing in a toilet and there s a floor joist in your way.
Toilet supply line rough in floor. Toilet rough in details. During construction plumbers install a home s basic plumbing system before fixtures are installed in a process called the plumbing rough in during the rough in plumbers install the home s drain and waste lines the pipes that will deliver used water to the sewer or septic tank and the supply lines the pipes that will deliver fresh water to the home from the water supply. I was looking for the supply line not the drain line obviously 12 from the wall won t work for the supply but is standard for the drain. Connect this supply line at the water line attached to the sink.
Insert the line through the bottom plate on the wall approximately 8 inches to the left of the toilet s center line. Once you ve created the map for the rough in layout get a pipe t connector and install it to the sewer stack. Also if you need help figuring out how to vent a toilet check out our other article here. Measured from centerline running vertically through the center of the toilet supply line hole should be 6 inches to the side of centerline.
Knowing these things can save you time and money. Install a inch copper water line to the location of your new toilet. The default spacing is measured outward from the flange and from the finished floor up to the wall. You may be able to use a different toilet rough in to dodge the framing.
Ideally 8 1 4 inches above the floor. You ll need a big pipe cutter for opening the main stack. Check toilet to confirm location water supply connection. Having the water supply line come out of the back wall is the most common solution.
Toilet supply line rough in dimension. Just get a water closet with a 10 rough in. The wall behind my toilet is an exterior wall and to protect the supply line from frost i want to run it through the floor rather than the wall. Cold water only pipe creates one hole between 5 and 10 inches above the floor supply line horizontal.
You can have this supply line come through the back wall or out of the floor depending on what is convenient. The general guide is six inches from the center to the left as you look at it facing the back wall. The water supply line of your new toilet should be a pipe. The height can vary depending on the floor base 5 25 at the lowest and can go up to about 8 aff if you have the toilet there you may even decide you could go higher or wider.
The t connector will create a branch drainage that will carry the wastewater from the sink toilet and tub or shower to the main sewer line.