Insert the line through the bottom plate on the wall approximately 8 inches to the left of the toilet s center line.
Toilet supply rough in through floor. The final rough in is for the toilet called water supply line. The distance of the toilet flange from the back wall depends on whether or not the construction is new or if a finished wall already exists. Knowing these things can save you time and money. A toilet s rough in refers to the measurement dimension from the finished wall to the center of mounting holes on the floor flange.
Pipe stub outs are the sections of pipe that feed from the lines run underneath a slab or building through the slab then connect to appliances or eventually continue on to the upper levels of your building. Or suppose you re roughing in a toilet and there s a floor joist in your way. Connect this supply line at the water line attached to the sink. Just get a water closet with a 10 rough in.
Toilets are typically offered in either 10 inch 12 inch or 14 inch rough ins. You must stub out toilets water lines and electrical conduit as well as main utility lines that enter the building from below the. Should i just use a drop ear and secure it to an added 2x4 in between the joists i guess i would attach. The 12 inch rough in is by far the most common in the us.
Stubbing pex out through finished floor. Use a 90 degree elbow or stub out fitting to insert the water line into the surface plane of the wall. The toilet flange distance from wall also known as a closet flange is the pipe fitting which mounts a toilet to the floor connecting the toilet drain to the drain pipe. Also if you need help figuring out how to vent a toilet check out our other article here.
You may be able to use a different toilet rough in to dodge the framing. The default spacing is measured outward from the flange and from the finished floor up to the wall. Measured from centerline running vertically through the center of the toilet supply line hole should be 6 inches to the side of centerline. Cold water only pipe creates one hole between 5 and 10 inches above the floor supply line horizontal.
Ideally 8 1 4 inches above the floor. Toilet rough in details. The general guide is six inches from the center to the left as you look at it facing the back wall. Home is on post and pier so big crawl space to work in.