Typical Concrete Floor Construction
Concrete floor slab construction process includes erection of formwork placement of reinforcement pouring compacting and finishing concrete and lastly removal of formwork and curing of concrete slab.
Typical concrete floor construction. If these steps are performed correctly the owner can expect an attractive durable product. If the floor is a ground floor provide resistance to. Concrete slab floor construction was often used for internal garages or lower levels of split level houses with suspended floors used for other parts of the house. A typical floor from the 1950s might comprise a layer of hardcore stone or broken brick a concrete slab probably 100 to 125mm thick and the floor finish.
Standard concrete floor slab thickness in residential construction is 4 inches. This is often timber to disguise the nature of the floor or in cheaper construction thermoplastic tiles laid in bitumen adhesive. Heat loss thermal insulation there are three general types of ground floor construction. The construction of suspended concrete floors is similar to that of timber but can span greater distances and offerings better sound insulation properties.
Assemble and erect formwork for slab2. Pour compact and finishing concrete floor slab4. Footings were designed in accordance with the nzs 1900 model building. A simple reinforced concrete flat slab is not usually economical as a suspended floor spanning over 5 m.
A typical way of constructing a solid floor would be to provide a base of hardcore with sand blinding with a layer of concrete over that. Common mistakes in concrete floor slab construction can be avoided with proper base preparation mix design placement finishing and curing.